Oil-immersed distribution transformers, pad-mounted units and prefabricated substations — sourced from audited Chinese factories, engineered to IEC and ANSI standards, shipped to Africa and the Middle East in 30–45 days.
Every unit ships with complete routine test reports per IEC 60076 or ANSI/IEEE C57. Third-party inspection (SGS / BV / TÜV) is welcome before shipment.

S11 / S13 / S20 low-loss and amorphous-alloy series. 6–35 kV, 30–4,000 kVA three-phase, 3–333 kVA single-phase pole-mounted. Dyn11 or Yyn0.
Explore →
Single-phase 15–250 kVA and three-phase 45–5,000 kVA. Loop or radial feed, NEMA 3R enclosure, built to ANSI/IEEE C57 with UL and CE options.
Explore →
American (ZGS) and European (YB) compact substations 30–2,500 kVA, with HV switchgear, metering and LV distribution integrated in one enclosure.
Explore →
SCB epoxy cast-resin units up to 35 kV class, and amorphous-alloy designs cutting no-load loss by 60–80% — built for buildings, solar and confined spaces.
Explore →We are the power-equipment export division of an established steel trading company in Shanghai. Same discipline: audited factories, verified documents, straight answers.
Three audited manufacturing partners — including a national high-tech enterprise exporting to 130+ countries with KEMA and UL type-test track records — matched to your spec and budget.
Every shipment includes routine test reports, type-test certificates, nameplate data and packing list. Third-party inspection before shipment is welcome, not resisted.
If a standard series meets your tender, we will not upsell a premium build. If a cheaper unit will fail your network, we will tell you before you buy.
Send your tender sheet or single-line diagram. We confirm ratings, vector group, losses and enclosure within one business day.
We match your spec to the right audited factory — loss class, budget and delivery window balanced.
Routine tests per IEC 60076 with full reports. Third-party inspection (SGS / BV / TÜV) arranged on request.
FOB / CIF shipping from Shanghai or Tianjin, 30–45 days typical. Commissioning questions answered by engineers, not salespeople.
Send it over — we reply with a priced technical offer within one business day, including test-report samples for the exact series quoted.